MAIN |
Sibur-Neftehem renewed negotiations with company Technimont and Basell about construction of a polythene of high density PE-HD factorySibur-Neftehem renewed negotiations with company Technimont and Basell about construction of a polythene of high density PE-HD factory ![]() As he said, up to third of volume of manufacture will fall to polythene for gas pipes under the order of Gazprom, packing polythene and constructional polythene. It was earlier planned to construct a similar factory in 2005-2006 Sibur-Neftehem and Technimont in September, 2001 have concluded the contract on construction). However because of the beginning of procedure of bankruptcy in Sibur and in Sibur-Neftehem realization of the project was suspended. Source: Plastinfo.ru Previous news |
© 2002—2025 PLASTINFO